| News
Shoreline maintenance work on Lake Saint-Louis
The City of Pointe-Claire would like to inform residents that shoreline maintenance work on Lake Saint-Louis will take place from February 11 to early March on Du Bord-du-Lac – Lakeshore Road, between Broadview and Baie-de-Valois Avenues.
The work will include laying gravel, gabions and a stone wall to prevent Du Bord-du-Lac –Lakeshore Road from eroding. Planting and sodding will follow in the spring.
In order to ensure everyone’s safety, flaggers will direct road traffic on Du Bord-du-Lac – Lakeshore Road.
Thank you for your cooperation.
Information: 514-630-1208, ingenierie@pointe-claire.ca