Préférez-vous toujours consulter ce site en anglais ?

Votre navigateur web est configuré pour le français.

Passer au français

Dock Improvements at the Pointe-Claire Canoe and Kayak Club

From March 2 to September 1, 2026, the Pointe-Claire Canoe and Kayak Club, located in District 2 – Lakeside, will undergo work to improve access to the water.

Description

Location: Pointe-Claire Canoe and Kayak Club

Two new docks and a boat launch will be installed at the Pointe-Claire Canoe and Kayak Club, the old anchors will be removed, and maintenance will be provided for five years to ensure their safety and durability.

Timeline

Work begins: March 2, 2026

Design, supply and installation of two docks and a boat ramp for the Pointe-Claire Canoe Kayak Club;
Removal of existing anchors (concrete blocks and train wheels);
Service and maintenance guaranteed for 5 years after installation.

Work ends: September 30, 2026

Notice of Work

There are currently no work notices.

Information

Engineering Department

Subscribe to our newsletters!