Préférez-vous toujours consulter ce site en anglais ?

Votre navigateur web est configuré pour le français.

Passer au français

Reconstruction of d'Ivanhoe Crescent Avenue

From May to September 2026, the City of Pointe-Claire will carry out reconstruction work on d'Ivanhoe Crescent Avenue.

Description

Location: d'Ivanhoe Crescent Avenue.

The work includes:

  • Complete reconstruction of sanitary, drinking water and rainwater services;
  • Reconstruction of foundation and road surface;
  • Replacement of street lamps.

Timeline

Work begins: May 4, 2026

Work ends: September 2026

Temporary drinking water supply

While the temporary drinking water system is in place, there may be interruptions to the water supply.

If this is the case, a door hanger will be distributed at the beginning and end of the boil-water advisory, along with detailed instructions.

What should I do during a boil-water advisory? 

Boil water for at least one minute before use (for drinking, cooking, washing fruit and vegetables, preparing baby bottles, etc.). 

Organic, recyclable and household waste collections

Organic, recyclable and household waste collections will take place as planned. The contractor will transport the bins and return them to their proper location.

Please consult the Collection Calendar for collection dates.

Access limited to local vehicles

During certain phases of the work, such as the installation of mains and drinking water services, pavement reconstruction and curb construction, access will be limited to local vehicles.

Take care of your lawn!

If you are affected by the reconstruction work, corrective work will be carried out on your grass surfaces.

This work is guaranteed for one year.

We ask you to take good care of your lawn. A poster with maintenance information will be sent to you after installation.

Claims 

For all claims, you must complete the form available on the City’s website and submit it to the Legal Affairs Department and City Clerk’s Office (greffe@pointe-claire.ca) within 15 calendar days of the date of the incident.

As a precaution, we recommend that you take time-stamped photos of the interior and exterior of your home before work begins.

If you have any questions or require further information, please consult the Claims Management Policy webpage. 

We invite you to read the latest work notice.

View the work notice

Presentation

The Engineering Department held an information session on January 14 at City Hall regarding the reconstruction work on d'Ivanhoe Crescent Avenue.

Watch the information session

Access the presentation

Information

Engineering Department

Subscribe to our newsletters!