Préférez-vous toujours consulter ce site en anglais ?

Votre navigateur web est configuré pour le français.

Passer au français
Page summary Arrow

Engineering Work Permit

Before undertaking any equipment installation, construction, or renovation project, you must first check if a permit or authorization certificate is required.

A permit request is required for the following engineering works:

  • Service connections
  • Fire hydrant connections
  • Widening your driveway or creating a new driveway (curb/sidewalk)
  • Building or replacing a culvert without a driveway
  • Moving a lamp post

Fees

Applicable fees are due when the application is submitted. Damage deposits are due when the permit or certificate of authorization is issued.

See the summary of fees. 

Requests are processed in the order they are received.

How to Apply?

Information

Engineering Department

Subscribe to our newsletters!