Préférez-vous toujours consulter ce site en anglais ?

Votre navigateur web est configuré pour le français.

Passer au français

Repair Work to Stairs at Terra-Cotta Park

This fall, the City of Pointe-Claire will carry out repairs on the stairs at Terra-Cotta Park, in District 5 – Lakeside Heights, between Viburnum Avenue and Soccer Field 2.

Description

Location: Terra-Cotta Park

These works will allow:

  • Creation of two staircases in natural stone, integrated into the slope of the site;
  • Laying lateral stones to stabilize the embankment, soften the slope and structure the planting areas;
  • Installation of handrails on both sides of the stairs;
  • Planting of ground cover.

Timeline

Work begins: August 24, 2026

End of work: October 30, 2026

Notice of Work

There are no work notices at this time.

Information

Engineering Department

Subscribe to our newsletters!