Préférez-vous toujours consulter ce site en anglais ?

Votre navigateur web est configuré pour le français.

Passer au français

Repairs to the service road of Highway Félix-Leclerc (40) West

Description

Places: Between Ellingham Avenue and Saint-Jean Boulevard.

Timeline

May 2025

Removal of existing structures;
Installation of catch basins;
Relocation of fire hydrants;
Repair and adjustment of services;
Construction of sidewalks and pedestrian refuges;
Installation of traffic lights;
Leveling of the foundation;
Laying of asphalt layers;
Epoxy marking.

Subscribe to our newsletters!