Préférez-vous toujours consulter ce site en anglais ?

Votre navigateur web est configuré pour le français.

Passer au français

Replacement of streetlights on Ashington and Inglewood Avenues

Description

Locations: Avenues Ashington and Inglewood

Timeline

May 2025

Removal of old streetlights;
Installation of new aluminum streetlights;
Reuse of existing LED luminaires;
Installation of new electrical conduits.

July 2025

End of work.

Traffic Disruptions

  • Ashington Avenue will be open to local traffic only.
  • The northbound lane of Inglewood Avenue will be closed to traffic between Duke-of-Kent and Sedgefield Avenues.

Details of the Work

The work involves replacing concrete light poles and adding aluminium light poles with LED streetlamps at the following locations:

  • Ashington Avenue;
  • Inglewood Avenue between Sedgefield and Duke-of-Kent Avenues;
  • The pedestrian path between Stillview and Ashington Avenues

Traffic During the Work

We ask that motorists exercise caution and reduce their speed when approaching work zones, to ensure the safety of all workers.

Information

Engineering Department

Subscribe to our newsletters!