Resurfacing of Highway 40 South Service Road and Saint-Jean Boulevard

From May 31 to August 14, 2026, resurfacing work will be carried out on the south service road of the Félix-Leclerc Highway (40) and Saint-Jean Boulevard.

Description

Location: 

  • South service road of the Félix-Leclerc Highway (40), between Saint-Jean Boulevard and des Sources Boulevard.
  • Saint-Jean Boulevard, in both directions, between the Dollard-des-Ormeaux city limit and the overpass above the Félix-Leclerc Highway.

The work includes:

  • Road surface levelling;
  • Spot reconstruction of sections of sidewalk and curbs;
  • Adjustment of services;
  • New asphalt layer;
  • Road surface marking

Please note that the work will be carried out in six phases.

Timeline

Work begins: May 31, 2026

Work ends: August 14, 2026

Saint-Jean Boulevard

The work on Saint-Jean Boulevard will involve the roadway and sidewalks. It will take place mainly at night, from May 31 to June 22, 2026, between 9:30 p.m. and 5:30 a.m. Some work could begin at 8:30 p.m.

The work will be carried out in two phases:

  • Phase 1 (mauve): on Saint-Jean Boulevard northbound, between the Saint-Jean Boulevard overpass and the northern boundary of the city.
  • Phase 2 (yellow): on Saint-Jean Boulevard southbound, between Labrosse Avenue and the Saint-Jean Boulevard overpass.

During the work, traffic will flow in the opposite direction in the lanes opposite the work zone. Normal traffic flow will be restored each morning.

Félix-Leclerc Highway (40) Eastbound Service Road

Work on the service road will include both daytime and nighttime phases.

The daytime phase will run from June 7 to 17, between 9 a.m. and 3 p.m., and will involve sidewalks throughout the area.

Nighttime work will take place from July 12 to August 14, 2026, between 8:30 p.m. and 5:30 a.m. It will be carried out in three phases:

  • Phase 1 (orange): between Saint-Jean Boulevard and Doyon Avenue. The entrance to Highway 40 eastbound will be closed.
  • Phase 2 (green): between Doyon Avenue and the Exit 55 ramp (Des Sources Boulevard).
  • Phase 3 (blue): between the Exit 55 ramp (Des Sources Boulevard) and Des Sources Boulevard. Exit 55 will be closed.

During construction, access to businesses will be maintained, but temporary interruptions may occur during paving operations. Traffic will be restored every morning.

Traffic and Detours

Detour routes will be set up during the work. Road users are asked to exercise caution and reduce their speed when approaching construction sites.

Additional Information

Dates and times are subject to change depending on weather conditions and authorizations from the Ministère des Transports et de la Mobilité durable (MTMD).

There are currently no work notices at the moment.