Préférez-vous toujours consulter ce site en anglais ?

Votre navigateur web est configuré pour le français.

Passer au français
Traffic and Roadwork

REM Construction Work: Traffic Impacts on Des Sources Boulevard

Published on September 29, 2026 to 9:21 a.m.

The City of Pointe-Claire would like to inform you that work related to the Réseau express métropolitain (REM) project will result in a lane closure on the left lane of Des Sources Boulevard, between Hymus Boulevard and the Félix-Leclerc (40) highway overpass, in both directions.

The work will take place from September 30 to October 2, from 9 a.m. to 3 p.m.

https://www.pointe-claire.ca/assets/images/Ing%C3%A9nierie/Capture-decran-2026-09-28-150439.png

Traffic and Detour

People wishing to access Place Transcanadienne from Des Sources Boulevard southbound will be required to follow the following detour:

  • Hymus Boulevard westbound
  • Delmar Avenue northbound
  • Service road eastbound of Félix-Leclerc (40) highway
  • Place Transcanadienne

Thank you for your understanding and cooperation during this period. 

For more information, visit the REM website.  

Subscribe to our newsletters!