|

Reconstruction of the soccer field at Terra-Cotta Park

APRIL TO LATE JULY 2021
  • Addition of protective netting, a drinking fountain and shaded shelters for the players
  • Addition of a synthetic surface with lines that allow for one game with 11 players per team to be played or two games with 7 players per team.
  • Reconstruction of the drainage system
  • Replacement of the lighting with LED lights
  • Reuse of the chain-link fence, stands and players’ benches
  • Redesign of the entrance to the fi eld and addition of bike racks