| News
Beginning of aqueduct work on Des Sources Boulevard
The City of Pointe-Claire would like to inform you that the structural rehabilitation of the aqueduct pipe on Des Sources Boulevard, from Chanteclerc to Cornish Avenues, will begin on April 27 and will continue until the end of June.
The purpose of the project is to reinforce the aqueduct pipe with the insertion of a structural sleeve inside the existing aqueduct.
As a preventive measure and to ensure everyone’s safety, access to Tudor Avenue via Des Sources Boulevard will be closed for the duration of the work.
Thank you for your cooperation.