| News
Edgewater Park parking lot – Drainage work
The City of Pointe-Claire would like to inform you that drainage of the Edgewater Park parking lot will begin on February 5 and will continue until the end of the month. The work will take place in the park, near the parking lot.
A row of parking spaces on the south side of the lot will be reserved for storage and access to the construction site.
The parking lot will remain open and a security perimeter will be set up around the work site. There will be no traffic interruptions.
Landscaping will follow in the spring.
Thank you for your cooperation.
Information: 514-630-1208, ingenierie@pointe-claire.ca