| News
REM –Traffic interruptions on Des Sources and Saint-Jean boulevards
The City of Pointe-Claire would like to inform you that traffic interruptions are to be anticipated on Des Sources and Saint-Jean boulevards.
This work is being done as part of the Réseau express métropolitain (REM) project, which will include two stops in Pointe-Claire.
Des Sources Boulevard
There will be traffic interruptions on Des Sources Boulevard between Hymus Boulevard and the Trans-Canada Highway from October 25 at 8 p.m. to October 27 at 7 p.m.
The lanes will be reorganized to open two lanes in both directions during the work. Access to Place Transcanadienne will be closed and a detour will be available.
Saint-Jean Boulevard
Complete closure of the access ramp to the westbound Trans-Canada Highway from Saint-Jean Boulevard southbound is scheduled for October 29 at 11 p.m. to October 30 at 6 a.m. A detour will be available.
Thank you for your understanding.
Information:
info@rem.info
1-833-rem-info (736-4636)
rem.info